
Division 1/1A
|
Menu
Clubs & Railway History MVAR OVAR OVGRS Ottawa Valley Live Steamers Ottawa Valley HOTRAK Bytown Railway Society (BRS) Colin Churcher's Railway Pages NMRA St Laurence Div. NMRA Canada Robert Craig Library Smiths Falls Railway MuseumMy Favorites
is a proud supporter of
|
Updated July 16, 2010 PASSING TRACK EXTENDED AT LIZARD HEAD. BERNARDO SPUR EXTENDED TO JOIN PASSING TRACK LIZARD HEAD. THIS NOW MAKES A TEST LOOP.
The Rio Grande Southern Train Yard is open for the 2010 season. Download my Rio Grande Station and Siding List.
The Ridgway Yard and Engine Facility Has 345 Feet of Track Laid. The Rico Yard and Engine facility Has 270 Feet of Track Laid. Montrose Yard Has 72 Feet of Track Laid The R.G.S. Main Line Measured 1810 Feet Laid. There are 35 Sidings and Passing Tracks. There will be 8 Water Towers. There are 6 Wyes'. (Ridgway, Dallas Divide, Placerville, Illium, Lizard Head, Rico). A new connecting track is operational between Jays & Dallas Divide. Total Track Laid So Far is 3558 Feet. Estimated Track Still to Lay is 100 Feet (in Pandora). Measured July 21 at 1:20 scale to be 5.78 miles of main line. ______________________________________________________________________________ Photo Gallery of Existing Stations & Sidings
![]() html hit counter
|